Loading...
2003-10-20 e e e Special OctDber T enn lHESTAlEOFTEXAS !i !i COUN1Y OF CALHOUN !i BE IT REMEMBER, that on this the 20'" day of October, A.D., 2003 there was begun and holden at the Courthouse In the Oty of Port Lavaca, said County and State, at 2:00 P.M., a RegularTenn of the Commissioner's Court within said County and State, and there were present Oil this date the following members of the Court, to-wit: Held October 20, 2003 Michael J. pfeifer Roger C. Galvan Michael J. Balajka H. Floyd Kenneth W. Finster Wendy Marvin County Judge Ciommissloner, Pet. 1 Commissioner, Pet. 2 Commissioner, Pet. 3 CommissIoner, Pet. 4 Deputy CoUllty Oerk Thereupon the following proceedings were had: Commissioner Galvan gave the Invocation and Commissioner Roster led the Pledge of Allegiance. HEAR REPORT FROM REPRESENTAilvES OF PFL~~~~C:NTON. HOOKER. P.l.L.C. REGARDING STAros OF D~GN FOR CALHOUN ____L A Motion was made by Commissioner Floyd alld seconded by Commissioner BaJajka that the Court supports the committee's decision that the Design Development Phase of the project has been achieved and should move forward into the CollstruCtioll Docwnent Developmeot Phase of the project. Commissioners' Galvan, Balajka, Floyd, Roster and Judge I'feifer all voted In favor. DESIGN DEVELOPMENT PHASE ESTIMATED PROJECT COSTS FOR NEW LAW ENFORCEMENT FACILITY CALHOUN COUNTY, TEXAS PFLUGER WIGINTON HOOKER ARCIDTECTS DATE: OCTOBER 20,2003 l) _ 280 CALHOUN COUNTY LAW ENFORCEMENT FACILITY '. IAREA ; 'SERVICES iTOTALS DESCRIPTION ; COST A. JAIL CONSTRUCTION I \ i T 1. Site Development 92700 gsf , $270,000 ! I $270,000 ; I 2. Utility Relocations $60,000 ! $60,000 I , 3. Kitchen Equipment $140,000 I $140,000 I 4. Laundry Equipment $9,000 i $9,000 i 5. Security Electronics $500,000 ' $500,000 6. Detention Equipment $600,000 $600,000 7. Building Construction 39,172 gsf $5,701,609 $5,701,609 Subtotal $7,280,609 $7,280,609 B. CONT1GENCY (5%) $364.000 C. CONSTRUCTION TOTAL $7.644.609 D. PROFESSIONAL SERVICE 1. ArcMectlEngineer (7.875%) $602,012 $602,012 2. Reimburseables (1 /2.r.) $38,223 $38,223 - ~ 3. Civil/Survey/Replattirig $26,500 $26,500 4. Windstorm Certification $2.500 $2,500 4. Soils/Testing $28,000 $28,000 Sublotal $697,235 $697,235 E. COUNTY COSTS / " 1 . Bond Insurance 125.000 , 2, Bond Underwriting 122,000 I 3. Land Acquisition 150,000 I Sub-total i 397,000 I PROJECT TOTAL ; $8,738,844 PFLUGER WIGINTON HOOKER, PLLC - ARCHITECTS JULY 10, 2003 . . e e e 281 #' ... . e e e " DESIGN DEVELOPMENT ESTIMATE Law Enforcement Facility-Calhoun County, Texas Date; Ocober 10, 2003 Design Development Estimate July 10, 2003 Fire Pump Insulated panel ex! wall Exposed Aggregate Fin;sh for panels 2055 UWity relocations increase Street demolition 2500 Paving drives 2512 Walkways Imported soil to raise floor level& fill street 2685 Gas Distribution System 2720 Storm Sewer Systems 2730 Sanitary Sewer Systems 2780 Power and Communication 2836 Retaining Walls 2842 Handicap Ramps 2876 Exterior Canopies 3320 Concrete Topping @chases 3470 Concrete Tilt-wall 5120 Structural Steel 5500 Miscellaneous Metal F abricat;on 6200 Finished Carpentry-{;8sework 7211 Wall Insulation 7250 Fireproofing 7620 Sheet Metal Flashing and Trim 7700 Roof Specialities & accessories 7722 Roof Hatches 7800 Skylights 8520 Aluminum Windows 4255 Masonry Veneer 9260 Gypsum Board Fireproofin9 9400 T errazzo@ showers 9680 Carpet Reduction 10850 Miscellaneous Specialties Janitor's Closet- mezzanine Reduce Medical Area Deduct link to Courthouse Adjustments Sub-total of estimated cost General Conditions (8%) General Overhead (3%) Profit (2%) Bond (1%) Revised Estimated Construction Cost Design/Construction Contingency(5%) Sub-total of estimated cost Parking Lot Site Demolition Link to Courthouse Total DO Estimate Revised 10-10-03 $6,384,706.00 $40,000.00 $324,000.00 $61,000.00 $12,000.00 $9,500.00 $3,810.00 -$9,528.00 $8,750.00 -$2,784.00 -$7,000.00 -$2,212.00 .$2,382.00 -$50,612.00 -$11,844.00 -$5,000.00 -$12,146.00 -$264,358.00 '$50,000.00 $10,000.00 $25,000.00 .$29,000.00 -$50,000.00 -$10,000.00 .$4,000.00 .$2,375.00 -$15,OOD.00 -$82,450,00 -$386,653.99 $153,000.00 -$3,000.00 $1,000.00 $10,000.00 -$8,000.00 .$55,000.00 -$20,000.00 .$405,284.99 $5,979,421.01 $478,353.68 $193,733.24 $133,030.16 $67,845.38 $6,852,383.47 $342,619.17 $7,195,002.64 $104,000.00 $30,000.00 $20,000.00 $7,349,002.64 Pfluger Wiginton Hooker Architects Revision to DD Estimate 7-10.03 i> 282 ESTIMATED PROJECT COSTS CALHOUN COUNTY LAW ENFORCEMENT FACILITY DESCRIPTION AREA COST SERVICES TOTALS A. JAIL CONSTRUCTION 1. Site Development 92700 gst $360.821 $360,821 2. Telephone cabling 1,000 1,000 3. Kitchen Equipment $140,000 $140,000 4. laundry Equipment $9,000 $9,000 5. Security Electronics $500,000 $500,000 6. Detention Equipment $600,000 $600,000 7, Building Construction 39,172 gst $5,166,562 $5,166,562 8. Signage $10,000 $10,000 Building Construction Total $6,787,383 $6,787,383 Parking lot $104,000 $104,000 Transfer link to Courthouse $20,000 $20,000 CONSTRUCTION TOTAL $6,911,383 $6,911,383 B. ARCHITECT SERVICES 1. Architect/Engineer (7.875%) $571,485 $571,485 2. Reimburseables (1/2%) $36,285 $36,285 Subtotal $607,770 $607,770 C. OTHER PROFESSIONAL SERVICES 1. Civil/Survey/Replatting $22,700 $22,700 2. Windstorm Certification $2,500 $2,500 3. Geotechnical $8,160 $8,160 4. Material Testing $20,000 $20,000 5. Management Fees (CM) $26,000 $26,000 Subtotal $79,360 $79,360 D. MISCELLANEOUS 5. Fumishings and Fixtures 24,000 6. Kilchen Smallwares 8,000 Sub-total 32,000 E. SITE ACQUISITION/PREPARATION 1. Property Acquisition 150,000 2. Site Demolition 15,000 3. Utilllty Relocation 75,000 Sub-total 240,000 F. FINANCING COSTS 1. Bond Issuance 92,000 2. Bond Underwriting 57,368 3. Bond Insurance 32,000 Sub-total 181,368 G. ESTIMATED PROJECT COSTS $8,051,881 I H. PROJECT CONTINGENCY I 448,119 PFLUGER WIGINTON HOOKER, PlLC . ARCHITECTS OCTOBER 16, 2003 . --,' e e e 283 e e ESTIMATED PROJECT COSTS CALHOUN COUNTY LAW ENFORCEMENT FACILITY IPROJECT TOTAL $8,500,000 I PFLUGER WIGINTON HOOKER, PLLC . ARCHITECTS OCTOBER 16, 2003 Meeting adjourned at approximately 3:00 pm. e , :"i.--~~ I' ~, " ~- 284